Part L Building Regulations Explained: Changes & Compliance 

As a builder or developer, you’ve likely heard of Building Regulations Part L. Part L 2021 came into force on 15 June 2022, and its transitional period ended in June 2023. Part L 2026, which brings in the Future Homes Standard, comes into force on 24 March 2027. You will need to be compliant with these regulations to avoid delays and potential fines. 

This article outlines the changes and how Access Fonn can help your construction business easily maintain Part L compliance.

4-mins

Written by Alex Boury.

Posted 10/11/2026

What are Building Regulations Part L?

Part L of the Building Regulations covers the conservation of fuel and power in new and existing buildings in England, including new homes and extensions. They establish how energy-efficient they should be. On June 15, 2022, Part L was updated with the mandate to improve the current minimum standard for carbon emissions by 31% - this was previously just 6%, so the increase is a significant one. From 24 March 2027, Part L is renamed "Energy and greenhouse gas emissions" and also requires reasonable provision to minimise greenhouse gas emissions. 

There are two volumes in Part L:  

  • Volume 1 

For new and existing homes. 

  • Volume 2 

Each volume covers both new buildings and work to existing buildings, such as extensions and renovations. 

Why are they important?

The 2021 changes to Part L were a stepping stone towards the Future Homes Standard, which was published in March 2026 and requires new homes to emit, on average, at least 75% less carbon than homes built to 2013 standards. 

The regulations have been introduced to help create greater energy efficiency and savings on energy costs, as well as better environmental sustainability and stronger compliance.

If companies do not adhere to Part L regulations they face possible consequences, which can include stop work orders, fines, legal action and potentially damage to reputation. Despite the changes coming into effect in June 2022, there are still construction companies asking what they need to do for Part L, with some even having to place large-scale projects on hold while the proper documentation is gathered. The impact on project timelines and overall costs add to potential headaches in getting things over the line. 

Part L key takeaways

Reducing carbon and ensuring energy efficiency over the entire lifespan of a building features significantly as part of the new building regulations in England. This can be achieved in several ways, such as maximising airtightness, optimising insulation and eliminating thermal bridging. 

Other takeaways to look out for in the Part L changes include:

  • Geotagged photos

Builders and developers are required to take photographs of the install to confirm the design details have been followed. Not only that, but photos should also have geo location information available to verify they are of the correct plot.

  • New carbon emission target

All new homes must produce around 31% less carbon emissions on average. New non-domestic builds need to produce around 27% less. 

  • New energy efficiency standard

For new or replacement walls in existing homes, U-values need to be improved from 0.28W/m2K to 0.18W/m2K, and the limiting values for replacement doors, windows and roof windows have improved from 1.6 to 1.4. 

  • SAP 10.2 replaces SAP 2012 

SAP 10.2 is responsible for setting and calculating the metrics and targets detailed above as well as other standards in building work. Under Part L 2026, SAP 10.3 takes over. 

Part L Compliance Made Easy with Access Fonn

Access Fonn’s user-friendly mobile app attaches geotagged photos to every task for easier SAP10 assessments.

How Does Part L Impact Construction? 

Part L doesn't just set a target on paper. It changes how projects are designed, priced, built and handed over. 

Energy decisions move to the start of design 

Under Part L 2026, new homes need low-carbon heating and, with limited exceptions, on-site renewable electricity. In practice, that means heat pumps and solar PV in most cases. These choices shape roof layouts, plant space and electrical capacity, so they need settling at design stage, not swapped in later. 

Costs need pricing correctly from tender 

Higher-performing fabric, heat pumps and solar PV all change the cost of a build. Pricing a scheme on old specifications, or missing which plots fall under which version of Part L, puts margin at risk before work starts. 

Programmes need room for evidence 

Photographic evidence has to be captured as each detail is finished, before it's covered up. If a photo is missed, work may need opening up again, or sign-off gets delayed while the gap is resolved. 

Transition timing affects every plot 

Transitional protection applies building by building, not site by site. On a large development, plots that don't start before 24 March 2028 lose transitional protection and must be built to the new standard. Start dates need planning plot by plot to avoid late redesigns. 

More people share responsibility 

Designers, site managers, subcontractors and energy assessors all contribute to Part L compliance. Under the Building Safety Act, clients, designers and contractors also have a legal duty to make sure the work complies (see below). 

Handover information matters more 

From 2027, information given to owners of new homes about ventilation, on-site electricity generation, overheating and fixed building services has to be provided in an appropriate format. 

When does your business need to be Part L compliant? 

Now! Part L (volumes 1 and 2) came into effect on 15 June 2022. The grace period also finished on 15 June 2023. It covered buildings where a building notice, initial notice or full plans were given before 15 June 2022, as long as work on that building started before 15 June 2023. All new homes are now assessed under the SAP 10.2 calculation procedure. As of now, your construction firm must be compliant with Part L, or face delays to projects which can lead to fines and other costs associated with project delays.  

Access Fonn has a dedicated solution that supports Part L compliance, without the need for additional tools to bring together the information that you need. 

When does Part L 2026 apply? 

Part L 2026, which brings in the Future Homes Standard, comes into force on 24 March 2027. For higher-risk building work, the date is 24 September 2027. 

Work can stay under Part L 2021 if the building notice, initial notice or full plans application was given before 24 March 2027, and work on that building starts before 24 March 2028. This applies to each building individually, so on a multi-plot site, every plot is assessed on its own start date. 

Part L 2026 also introduces a new requirement, L3, for on-site renewable electricity generation in new homes. 

How Does Part L Integrate with the Building Safety Act? 

Part L sets the energy standard a building has to meet. The Building Safety Act 2022 changes who is accountable for meeting it, and how that's checked. 

Dutyholders are responsible for Part L compliance 

 Since 1 October 2023, the dutyholder regime has applied to most building work in England, not just high-rise. Clients, principal designers and principal contractors must plan, manage and monitor work so it meets all relevant building regulations, and that includes Part L. Energy performance is no longer something to leave to the SAP assessor at the end of the job. 

Higher-risk buildings go through the Building Safety Regulator 

Higher-risk buildings are at least 18 metres or seven storeys tall and either have at least two residential units or are hospitals or care homes. For these, the Building Safety Regulator is the building control authority, and approval runs through a series of gateways. 

  • Gateway 2: work can't start until the regulator approves the building control application. The design has to show how the building will meet every applicable requirement, Part L included. 
  • Gateway 3: the building can't be occupied until the regulator issues a completion certificate. That depends on showing the building was built as approved, so Part L records like as-built energy calculations and photographic evidence form part of the picture. 

Design changes after approval go through formal change control. A late swap to insulation, glazing or heating can affect both Part L and the approval itself. 

The 'golden thread' 

Higher-risk buildings also need a 'golden thread": accurate, up-to-date digital information about how the building was designed and built. Part L evidence belongs in that record. 

Part L 2026 timing is different for higher-risk buildings 

The Future Homes Standard applies to higher-risk building work from 24 September 2027, six months after other buildings. It has its own transitional rules, based on when the application was submitted to the regulator. 

In practice, both regimes reward the same thing: a complete, organised record of what was designed and what was built. 

5 Step-Plan: How to stay compliant with Part L

There are several steps you should take to be compliant with Building Regulations Part L:

1. Plan your schedule of works

Provide your EPC assessor with drawings and specifications of the build in full detail.

2. Capture information at every stage

Share your scope of works with your whole team, and notify your assessor of any changes.

3. Ensure your information has metadata and geotags embedded

Images that are not correctly tagged may be rejected by your SAP assessor.

4. Keep documentation available

Ideally, everything should be available in one location.

5. Access reports on-demand

SAP calculations and EPC are submitted to the building control body - everything should be kept together.

Fonn dashboard - pat L compliance

How Access Fonn can help with Part L compliance 

The Access Fonn app captures photos of the build and automatically geotags them for the SAP10 assessment. Our system produces a full report in PDF format, capturing all relevant details, dates and time stamps which will make any Part L assessment much easier, while providing full transparency to EPC assessor and end user.

Fonn has developed this feature alongside several well-known building companies. This ensures the platform is compliant and easy to use for the build team.

Part L Compliance Made Easy with Access Fonn 

Access Fonn’s user-friendly mobile app attaches geotagged photos to every task for easier SAP10 assessments.