One platform, every machine
Owned and hired plant connected to projects and costs in a single system.
Coins Evo
UK contractors and homebuilders often carry plant they cannot see. Machines sit idle on one site while a crew hires the same asset across the country.
Construction plant management software from Access Coins Evo connects plant, projects, and finance on one platform, so every machine is costed to the right project as the work happens, with AI that flags maintenance before a breakdown.
Owned and hired plant connected to projects and costs in a single system.
See utilisation and location across every site before you sign the next hire agreement.
Usage flows straight to project costs, with no manual logs and no extra back-office headcount.
Schedule maintenance by engine hours or date, so machines run when the project needs them.
Keep every owned and hired asset on one live register, with its location across every site. Visibility is the first pound saved, because hire spend cannot be cut on plant that cannot be seen.
Capabilities
Controls
Schedule preventive maintenance by engine hours or calendar date and track every repair and cost in one view.
Machines are ready when work demands them, and plant failure no longer stalls the crew and the programme.
Capabilities
Controls
Plant usage is allocated to the right project phase automatically as machines work, so project costs reflect reality while there is still time to act. Overruns surface phase by phase rather than at the end.
Capabilities
Controls
Track every hire agreement alongside the owned fleet, so the cost of each hire is clear, and the hire-versus-own call is made before money is committed.
Double-hiring and missed off-hire dates no longer drain margin month after month.
Capabilities
Controls
Materials and parts are tracked from the store to the site, with allocation, transfers, and reorder alerts. Crews are supplied on schedule, without the over-ordering that ties up working capital and leaves surplus stock on site.
Capabilities
Controls
Construction plant management software brings the tracking, maintenance, costing, and hire of a contractor's plant into one system.
It covers owned and hired assets together, with location across sites, utilisation reporting, preventive maintenance, and the true cost of running each machine.
Access Coins Evo goes further by building these into the same platform as job costing and finance, so plant usage becomes project cost in a single step rather than a figure reconciled after the fact.
Access Coins Evo keeps every owned and hired asset on one register, with live location across all sites. For each asset, it shows availability, utilisation, maintenance schedule, repair history, and true cost.
Because plant shares a platform with projects and finance, usage costs flow straight to the right project automatically. It also covers stock and materials from stores to site, so parts and consumables are tracked alongside the plant that uses them.
Yes. Access Coins Evo's construction plant management software keeps owned and hired assets on one register, so you can check what you already own before committing to a hire.
Hire agreements are tracked with off-hire and return dates, and hire costs are allocated to the right project. This is how teams cut spend on machines they were hiring while identical owned assets sat idle elsewhere.
Access Coins Evo holds asset records under permission control, with a full change history on every record. Maintenance and stock movements carry their own audit trails, and new hire commitments can be routed through approvals.
Plant costs flow into the project ledger with a traceable audit trail, giving finance and commercial teams a single, auditable source for what each asset costs and who changed what.
Because plant usage is costed to the project as the work happens, the cost of every owned and hired machine is already in the project ledger when cost value reconciliation runs.
Commercial teams see plant against budget in the live commercial picture rather than reconciling plant returns separately at month end. That means the CVR reflects real plant cost, and hire-versus-own decisions are made against current figures instead of estimates.