Finite production scheduling
Decrease risk
Finite scheduling enables you to take your production scheduling
to the next level - based upon the actual finite capacity of your
resources and the rules you specify. It ensures that operations are
only scheduled when the necessary resources are available, by
tracking and maximising the utilisation of your machinery, manpower
and other constraints on the production process. The outcome: you
spend less time progress chasing and more time concentrating on the
everyday challenge of balancing capacity with demand, thereby
increasing efficiency and improving delivery times.
Managing WIP
This form of production scheduling helps work in progress
to stay at a more constant level, with all the associated benefits:
materials are only ordered when needed, inventory levels fall back,
bottleneck resources are not overloaded and lead times become more
predictable.
Individual process routes can be defined for each product and
the system handles forwards, backwards and bi-directional loading
of jobs. You have complete control over resource states and
efficiencies (finite and infinite), and - in addition to powerful
in-built reporting - you can choose to manipulate your data using
Gantt charts.